EnviroGroup was selected by Leighton Contractors, to install a 112 module PV system at the Western Hospital in Footscray. The system totals 19.04kW, and was installed as a 46 metre-long vertical wall, to obscure a machinery room above the Western wing of the hospital.

This solar power installation is an excellent example of building integrated photovotaics.

The system comprises

  • 19.04kW system
monash business incubator 550x750 3grantham st medical 550x750 1